What to check when buying a server

The decisions that hurt are rarely visible on the quotation. Here is what to look at before signing.

A server is a five-to-seven year commitment. Most of the regret we see comes from three or four specification decisions that looked like savings at purchase and became constraints eighteen months later.

Start from the workload, not the catalogue

Before any part number, answer these:

  • What will actually run on it — file services, a database, an application, virtual machines? How many, and how big?
  • How many users, and what is the concurrency at peak rather than on average?
  • Are you virtualising? If so, plan for the hypervisor overhead and for the machine carrying its neighbour's load when the other host is down.
  • How fast is your data growing? Take last year's growth and project three years.

A specification produced without these answers is a guess with a warranty.

Memory is where you buy headroom

RAM is the component that most often runs out first, and it is the cheapest one to over-specify at purchase.

Two practical points. First, populate the memory channels correctly — a wrongly distributed configuration costs measurable bandwidth for no saving. Second, leave empty slots. Filling every slot with small modules means the only upgrade path is throwing away what you bought.

For a virtualisation host, size for the machines you plan plus roughly 30% headroom, and check the maximum the platform supports before assuming you can expand later.

Disks: type, count and controller

SSD or spinning disk? For anything a person waits on — databases, application servers, virtual machine storage — SSD. Spinning disks remain reasonable for bulk archive and backup targets where capacity per lira is what matters.

Enterprise or consumer drives? Enterprise drives are specified for continuous operation and for write endurance. Consumer SSDs in a server are a false economy that shows up as a failed drive in year two.

Controller cache and its battery. A RAID controller with write-back cache is substantially faster — but if the cache protection battery or capacitor fails, the controller silently drops to write-through and performance falls off a cliff. This is a genuinely common and genuinely confusing fault. Check the battery is included and that the monitoring covers it.

RAID: match the level to the job

  • RAID 1 — two disks mirrored. Simple, reliable, half the capacity. Good for boot volumes.
  • RAID 10 — mirroring plus striping. Best performance for databases and virtual machines; costs half your raw capacity.
  • RAID 5 — one disk of parity. Efficient, but rebuilds on large modern drives take a long time and the array is vulnerable throughout. Increasingly hard to justify on high-capacity disks.
  • RAID 6 — two disks of parity, survives a second failure during rebuild. The sensible choice where RAID 5 used to be.

And the thing that has to be said every time: RAID is not backup. It protects against a disk failing. It does not protect against deletion, corruption, ransomware or the building burning down.

Redundancy and the warranty that matters

Dual power supplies on anything the business depends on — and plugged into different circuits, otherwise you have two power supplies and one point of failure.

Warranty response time is the specification people ignore. Next-business-day on-site versus a four-hour response is a real cost difference, and it is exactly the difference between an inconvenience and a lost trading day. Decide it against what downtime actually costs you, not against the quotation total.

Also check the warranty duration matches your intended life. A three-year warranty on a machine you plan to run for six means three years of exposure.

Do not forget the licensing

Windows Server licensing is by physical core with a minimum count, and virtual machine rights differ substantially between Standard and Datacenter. A host with many virtual machines can make Datacenter cheaper despite the higher headline price. Get this checked before ordering the hardware, because core count affects it.

The same applies to your hypervisor and your backup software, both of which are commonly licensed per socket, per core or per protected machine. These are regularly left off quotations and then arrive as a surprise.

Need help with this?

Ask us about server and hardware supply, or request a free assessment directly.

Server and hardware supply
Blog

More articles

Servers

VMware ESXi or Hyper-V? A comparison

Both work. What decides it is licensing, what your backup product supports, and what your team already knows.

Servers

Windows Server upgrades: when and how

Running past end of support is not a technical preference — it is a compliance position, and usually not a defensible one.